Name |
Location |
Work Completed |
View |
Marionville |
Township of Russell |
Water-main & Feeder-main ; 3.7 kilometers water-main plus associated works at pumping station; 5,520 meters of 300mm potable water transmission |
|
Hawkesbury |
|
5.0 kilometers of water-main plus associated works; Installed feedermain – 500mm on Main Street 1,450 meters; Installed feedermain – 450mm on McGill Street 1,483 meters |
|
Moose Creek |
|
10+ kilometers of sanitary sewer, water-main & associated works; Installed 6,617 meters of watermain distribution system; Installed 3,301 meters of sanitary collector system; Built 5.3 km of roads and 3.1 km of sidewalks; Installed 1 km of sanitary forcemain; 216 house connections |
|
Township of Russell |
|
13,450 meters of 450mm of water transmission line; 1,500 meters of 400mm water distribution system; Road restoration |
|
St. Albert |
|
Installed 3,100 meters of sanitary collector system; Built 3.1 km of roads and 1.3 km of sidewalks; 122 houses connections |
|
St. Andrews |
|
Installed 3,141 meters of 300 mm water transmission line |
|
St. Isidore |
Prescott and Russell United Counties |
Installed +,600 meters of watermain distribution system; Installed 298 services; Installed 3,203 meters of potable water transmission line |
|
Alfred |
|
Transmission Line; Installed 3,900 meters of water distribution system; 145 water services |
|
Russell |
|
5,825 meters of 250mm potable water transmission line; 6,100 meters of water distribution system; 2,525 meters of sanitary forcemain 250mm; 233 services to houses |
|
Bourget |
|
Emergency Water Shortage; Installed 1,082 meters of water distribution system; Installed 40 water services; Built 1.1 km of roads |
|
Clarence Creek |
|
Installed 4,175 meters of water distribution system; Installed 224 services; Built 5,270 meters of sidewalks and curbs; Built 4.4 km of roads |
|
Winchester |
|
Installed 1730 meters of sanitary forcemain |
|
Alexandria |
|
Replaced 330 meters of existing watermain and sanitary sewer with new watermain and sanitary sewer; Replaced 17 services |
|
Cornwall |
|
Installed 400 meters of storm sewer box culvert (1.5m x 2.4m) |
|
Lefaivre |
|
Installed 2,860 meters of water distribution system; 105 water services |
|
Hammond |
|
Installed 1,840 meters of water distribution system; Installed 89 water services; Built 2.4 km of roads and 1.5 km of curbs |
|
Limoges |
|
Installed 3,600 meters of sanitary forcemain and water transmission line; Installed 720 meters of water distribution c/w 8 services |
|
Wendover |
|
Installed 4,000 meters of water distribution system; 105 water services |
|
Village of Alfred |
Watermain from Ottawa River to Village of Alfred |
Installed 9.2 km of transmission line |
|